Civil Work Covers The Essential Interior Preparation Of Your Kitchen Space—Flooring, Tiling, Plumbing, Drainage, Electrical Wiring, Exhaust Ducting, And Basic Finishes Needed To Make Your Kitchen Operational.
The Client Is Responsible For The Main Building Structure, External Walls, Waterproofing, And External Repairs. This Civil Work Package Is Limited To Interiors Only
Yes. After Understanding Your Concept, Menu, And Space Size, We Tailor The Package To Fit Your Operational Needs And Budget. Any Extra Requirements Beyond The Standard Scope Will Be Quoted Separately
The Bundle Does Not Include Government Licenses, FSSAI Approvals, Fire Nocs, Or Other Statutory Permissions. These Must Be Secured By The Client Directly Or Via An Independent Consultant. Licensing Services Are Available Separately As An Add-On
On Average, Civil Work Takes 4–6 Weeks, Depending On Project Size, Space Readiness, And Any Site-Specific Conditions. Timelines Are Shared After Finalisation Of Scope
We Provide A Post-Handover Operational Guarantee For All Work Executed By Us, Which Is Also Covered Under A 6-Month Warranty. This Warranty Excludes Natural Wear And Tear, Misuse, Or Issues Arising From External Structural Factors
We Conduct A Site Survey Before Starting. If Existing Work Meets Our Standards, We Will Only Complete The Missing Scope. If Modifications Are Needed, Additional Costs Will Be Informed Upfront
Yes. Any Additional Work Required Due To Hidden Damages, Structural Changes, Or Unforeseen Site Conditions Will Be Discussed And Approved Before Execution
Our Package Includes Standard Materials Needed To Complete The Scope. If You Require Premium Brands, Finishes, Or Fixtures, These Will Be Billed Separately Or Can Be Client-Supplied
Yes. The Site Should Be Clear, Accessible, And Free From Other Contractors’ Work For Smooth Execution. Delays Due To Site Unavailability Will Extend The Timeline
Yes. Civil Work Involves Cutting, Drilling And Installation, Which Generates Dust And Noise. Our Team Tries To Minimize Disruption, But Clients Should Be Prepared For Site Activity During Execution
Our Team Takes Utmost Care. Any Incidental Damage Caused By Us Will Be Repaired, But Hidden/Weak Existing Utilities And External Issues Are Beyond Our Responsibility